Concrete pump parts of the late maintenance of concrete piston

times   2016-09-06

Concrete pump parts of concrete piston lip lip part of the radial wear and tear, and the degree of relatively uniform wear. Improper maintenance, poor lubrication, load is too large, concrete pump parts concrete piston quality problems, such as the size of the material is too large or material wear resistance, etc..

After the replacement of the new concrete piston must be carried out in the late maintenance

1. Often withdraw from the concrete pump parts piston, clean and coated with oil;

2. It is found that the cement mortar should be replaced immediately in the washing room;

3. Always replace the cooling water, clean the washing room and keep it clean;

4. Add enough cooling water, add the hydraulic oil to the hydraulic oil to improve the lubrication according to the need.