Name |
Data |
Control |
Radio and cable remote control |
Climbing style |
The paddle, walking type, ship type, |
The motor power |
78kw |
Angle of rotation |
360 degree |
Color |
Yellow,blue,According to customer requirements |
Model |
12m,15m,etc |
Weight |
1100kg-1900kg |
Product
specifications:
Concrete Placing Boom Pipe , Cloth machine
Specifications
12meters manual
15meters manual
18meters manual
18meters (bearing)
The big arm design
Dualchannel
Dualchannel
Dualchannel
Dualchannel
Radius of gyration (m)
12
15
18
18
The height of the placing boom
4
4
4
4
Diameter of conveying pipe (mm)
125
125
125
125
Leg span (m)
3.2*3.2
4*4
4*4
4*4
Rotation Methods
Manual
Manual
Manual
Manual
The whole weight (kg)
1100
1500
1600
1600
With weight (kg)
600
800
1000
1000
Slewing bearing type
315
315
380
500
Material
Channel angle
Channel angle
Channel angle
Channel
angle
Slewing range
360°
360°
360°
360°
Concrete placing boom features
1,Frame type big arm structure, increase the bearing capacity and stability.
2, High quality rotary bearing, flexible rotation, downy.
3, Double support legs to improve stability and endurance double.
4, With excellent firmness compared with GB steel, angle iron increased several times
5, Impact on the environment vibration slightly
6, With four cables to ensure a stable and secure products for the process
Our advantages:
1. Two foldable booms.
2. Our placing boom has captured the market share with good quality, competitive
price and good after sale service.
3. It is the necessary auxiliary equipment for pump transferring in construction field.
4. The machine is pulled by hand and can be slewing 360.
Our Services:
1, Engineers available to service machinery overseas
2, Quality problems returned free of charge
3, Customizable
4, Send free samples
5, Product specifications can be customized according to the requirements
6, Provide consumers with regular visits
7,Enterprises through the ISO9000 certification, the product passed 3 c certification,
full compliance with national standards
8,Ensure the supply of parts
Packaging and transport:No.1 Export standard packing
No.2 Seaworthy packing
No.3 other ways or according to the customer demand
FAQ
1. are you a manufacture or a trading company?
we are the manufacture , found in 1986.
2. what your delivery time?
about 10days after received the deposit
3. what payment terms do you accept?
we accept L/C at sight, T/T, 30%prepaid, 70% paid after you received the copy of B/L.
west union and so on.
Other products