ground screw piles
Thursday, 31 August 2017
by admin
ground screw piles, also called as screw pile, is a concrete free ground foundation, which is quicker, more efficient, sustainable and value for money compared to concrete foundations. It’s a proven technology as ground mounting system for solar PV and housing, also it’s gradually applied in highway roads,construction fields etc. Features of ground screw piles:
- Published in Ground Screw Piles
Tagged under:
ground screw piles
ground screw piles used in fencing industry
Thursday, 16 March 2017
by admin
Materials: ISO630 Fe A / DIN EN10025 Fe 360 B Diameter of pipe: 76MM Thickness of pipe:3MM Length: 1200MM Nuts:3XM16 Finishing surface:Hot dipped galvanizedas standard DIN EN ISO 1461-1999 Packing:Pallets Quatity /20″ Container : 3000pcs Payment Term: 30% prepayment ,the balance at sight B/L copy. Delivery Time: 30 days after get 30% prepayment Advantage;Easy installation
- Published in Ground Screw Piles
Tagged under:
ground screw piles
Solar Power System ground screw piles
Thursday, 16 March 2017
by admin
Surface:Hot galvanized Material:steel; Length:1600 Outer size:76mm,thickness:3-4mm HELIX:220*8mm Nuts:M24
- Published in Ground Screw Piles
Tagged under:
ground screw piles
Hot dipped galvanized constructional used ground screw piles
Thursday, 16 March 2017
by admin
Material:steel; Surface:galvanized Length:1200mm Outer size:76mm,thickness:3-4mm Adjustment:M24 Flange thickness:8mm Flange outer size:220mm Product Name Ground earht screw with round flange Length 1200-3000mm Out Pipe Dia 76-114mm Pipe Thickness 3-4mm Weight 9.4-25.3kg Material ISO630 Fe A / Din EN10025 Fe 360 B Surface Finished Hot Dipped Galv. As standard DIN EN ISO 1461-1999 Payment T/T,
- Published in Ground Screw Piles
Tagged under:
ground screw piles
flag poles and banners ground screw piles
Thursday, 16 March 2017
by admin
Diameter of pipe:68MM Length:580MM Thickness of pipe:1.7MM Nuts:1XM8 Materials:Q235 Finishing surface:Hot dipped galvanized Packing:6PCS/CTN Quatity /20″ Container : 10800pcs Payment Term: 30% prepayment ,the balance at sight B/L copy. Delivery Time: 30ays after get 30% prepayment
- Published in Ground Screw Piles
Tagged under:
ground screw piles