HOW TO SHOP

1 Login or create new account.
2 Review your order.
3 Payment & FREE shipment

If you still have problems, please let us know, by sending an email to [email protected] . Thank you!

SHOWROOM HOURS

Mon-Fri 9:00AM - 6:00AM
Sat - 9:00AM-5:00PM
Sundays by appointment only!

SIGN IN YOUR ACCOUNT TO HAVE ACCESS TO DIFFERENT FEATURES

FORGOT YOUR PASSWORD?

FORGOT YOUR DETAILS?

AAH, WAIT, I REMEMBER NOW!
MAIL: [email protected] ----- QUESTIONS? CALL:
  • LOGIN
  • SUPPORT

PK - A leading professional manufacturer for concrete pump parts .

PK - A leading professional manufacturer for concrete pump parts .

manufacture of STEEL PIPE & fittings

T :+86
Email: [email protected]

STEEL PIPE AND FITTINGS COMPANY
HEBEI PROVINCE , CHINA

Open in Google Maps
  • HOMEPAGE
  • ABOUT US
    • COMPANY VIEW
    • HISTORY
    • CHOOSE US
    • HONOR
  • PRODUCTS
    • Alloy steel pipe
      • HASTELLOY Steel
      • INCOLOY Steel
      • INCONEL STEEL
      • NICKEL Steel
      • MONEL Steel
    • Steel Pipe Flange
    • Steel Pipe Reducer
    • Steel Pipe Elbow
    • Grooved Pipe Fitting
    • Concrete pump and Parts
      • Concrete Pump Pipe
      • Concrete Pump Elbow
      • Concrete Pump Clamp
      • Concrete Pump Bend
      • Concrete Pump Flange
      • Concrete Placing Boom
      • Concrete Pump Parts
      • Concrete Pump Piston
      • Concrete Pump Rubber Hose
      • Concrete pump wear plate and wear ring
      • Concrete Pump Cylinder
      • Concrete Pump Gasket
      • PUTZMEISTER
      • SCHWING
      • Ground Screw Piles
  • CLIENT & EXHIBITION
  • TECHNICAL KNOWLEDGE
    • concrete pump parts knowledge
  • CONTACT US
FREEQUOTE
  • Home
  • Concrete placing boom
  • The installation procedure of the concrete pump placing boom

The installation procedure of the concrete pump placing boom

The installation procedure of the concrete pump placing boom

by admin / Saturday, 09 April 2016 / Published in Concrete placing boom

The installation procedure of the concrete pump placing boom

Before we introduced the concrete pump placing boom demolition problem, today will install the installation sequence to explain:
A, the Tower body part installs
B. Installation of turntable
C, the installation of the balance arm
D, balance heavy installation (2 pieces first installed balance weight)
E, the installation of the ARM rack assembly
F, balance heavy installation (2 pieces of balance after installation)
g, installation of electrical components
h, connection operation equipment
I, connecting the size of the arm of the tubing
J, Installation Complete The general working conditions of the concrete pump placing boom are large arms up, small arms downward. In the rising section of the pipeline (the tower body and the large arm pipeline), the concrete in the pipeline is pushed forward under the pump pressure of the concrete pump. The concrete is filled with the upward pipeline, its flow rate is stable, does not occur segregation. In the descending section of the pipeline (middle and small arm), the velocity of concrete is faster and quicker due to the effect of gravitational acceleration. Because the flow of concrete in the falling section will not change, the accelerated concrete can not be filled with conveying pipelines. The concrete is not “propelled” stably in the descending pipeline, but is “rolled down” quickly.

In the “tumble” process, the concrete and the pipe wall constantly collide, the aggregate will be separated from the slurry, resulting in the first segregation

 concrete pump spare parts stationary concrete placing boom for construction work

Self-Climbing Placing Booms

HGY17

HGY24

HGY28

HGY32

Horizontal Reach(m)

17

24

26

32

Length of End Hose(m)

3

3

3

3

Stationary Height(M)

11

21

21

21

Rotation (°)

360

360

360

360

Elevation Angle (°)

-4~90

-4~90

-4~90

-4~90

Hydraulics Output (kw)

5.5

11

11

16.5

Mode of Drive

Hydraulic

Hydraulic

Hydraulic

Hydraulic

Mode of Operation

Radio/Cable/Control panel

Pipeline Diameter (mm)

125

125

125

125

concrete pump stationary concrete placing boom for construction work
 
  
 
Production & Package

concrete pump stationary concrete placing boom for construction work 

Concrete Pump Parts

concrete pump stationary concrete placing boom for construction work 

 

 

  • Tweet

What you can read next

putzmeister concrete placing boom
Pump Pipe Elbow
Concrete placing boom elbow,Distributor,DN125,2 Arms/3 Arms/ 4 Arms
12M manual concrete boom placing

You must be logged in to post a comment.

  • DISCLAIMER
  • SUPPORT POLICY
  • LEGAL
PK - A leading professional manufacturer for concrete pump parts .

© 2016 All rights reserved. Steel Pipe & Fitting Co., Ltd. Concrete pump parts | Sitemap

TOP